The Tunnel boring machine (TBM) cuts a perfectly round tunnel 3.6 m across in hard rock, without blasting. It is slow to set up and expensive, but once it is running it keeps going on its own power and sends the muck out behind it.
Getting it
| Shop | Tunnel boring machine (TBM) kit, $185,000, company level 7 |
| Power | 110 kW to the cutterhead, from the camp network (a 150 kVA generator) |
| Water | 3,000 L of cooling water |
| Upgrades | TBM: mantle cutterhead, $78,000, level 8; TBM: track-laying rig, $21,000, level 7 |
You get one kit. It does not appear by itself: put it together in build mode (B → Deep machines → TBM). It does not go down a shaft. To move it, take it apart with X and build it again somewhere else; it only crawls about 6 m from where it last bored.
The launch
The TBM can start underground without a shaft. It needs fairly level ground with a face ahead:
- in front of a hillside or a pit wall,
- at the end of a gallery or a box cut, or
- on flat land (set a downward grade).
Aim the ghost where you want the machine and turn the mouse wheel to choose the starting grade: 0°, −5° or −10°. On flat ground, 0° will not take the machine underground: use −5° or −10°.

When you click, the assembly crew works for about 20 seconds. They dig the launch pit, level the floor and put up a steel thrust frame behind the machine, then lower the machine in. The preview note tells you how many cubic metres they will dig. The cut is free.
For the first metres, the TBM pushes off the thrust frame with its rams. Once it is inside its own tunnel, its grippers brace on the walls on both sides and take over. If the grippers cannot find a wall, the game tells you: take it apart and set it up again, or drive it into a tunnel.
It is refused if the floor is too uneven (the footprint may vary by 1.5 m), if the ground is almost all solid rock, if it is on the camp floor or near a shaft mouth, or if something is built where the machine or its frame would stand.
Boring
Press E to get in and click to start. The machine runs a cycle: the grippers press on the walls, the head turns and pushes forward 1.5 m, then it regrips and goes on.
- The HUD shows the current rate in m/min. In hard igneous rock it is about 2.4 m/min; harder rock is slower.
- R / F change the bore grade, from −10° (down) to +5° (up).
- A / D steer a little. While it pushes off the frame it cannot turn.
- Click again to stop. Space dumps the muck bunker behind the machine.
Power must reach the machine. If it says there is no power, the cable is too far from a live pole or the generator is too small. See Power and light.
The rock ahead
The TBM has a probe that scans the rock ahead. It shows the rock temperature and warns you if there is a lava pocket in front. If one is near, the machine stops. Back off and go around, or click to push on anyway: the lava will then fill the machine.
If lava touches the machine, pull back with S and press Q to spray cooling water: the lava forms a crust.
The standard head only skids on mantle rock. For that you need the mantle cutterhead upgrade.
Water and heat
The cutterhead heats up as it works, and more the deeper you go. If the 3,000 L of cooling water runs out, the head overheats and stops. Call the service with Y (diesel and water). If the machine is damaged, repair it with T.
Muck
The muck bunker holds 160 units. When it is full, the TBM stops and waits until you dump the bunker with Space or a car is under the tail chute.
Rail mode and the muck train
For long tunnels, use the muck train. Buy these from build mode:
| Part | Price | Level |
|---|---|---|
| Muck car (4 m³, 480 units, side-tipping) | $5,200 | 6 |
| Heavy tunnel locomotive (10 t, battery) | $38,000 | 6 |
| Muck dump station (3000-unit bunker) | $9,500 | 5 |
Lay track behind the TBM with the Rail drag tool. Put the muck cars on the rail and the heavy locomotive at the end of the train. Then press H on the TBM for rail mode. In rail mode the grade is limited to 0, −2 or −4° with R / F, and the train couples to the TBM's draw bar. The car under the tail chute fills first. When it is full, the train shifts one car along. When the front car is full, the train releases.
Press O on the locomotive for the automatic shuttle. It runs the train between the TBM and the dump station by itself. At the dump station, each car runs up the ramp and tips into the bunker, and the station's outlet belt carries the muck away, or sells it if it ends at the dump yard.
The shuttle stops and tells you why: the battery is empty, the track is broken, the station bunker is full, or a loaded train cannot climb the grade. A loaded train cannot climb more than about 2 degrees, so build the dump station lower than the face. If a player is on the track, the train slows and stops 2 m before.
Passing loop
A single track means a single train. Add a passing loop with the Rail tool so that two trains can pass. The tool tells you when the loop is more than 60 m from the face: move it forward as the machine advances, or the TBM waits for the train.
Track laying
With the track-laying rig upgrade, press H for rail mode and the TBM lays track by itself: when the end of the rail is more than 3 m behind the hook, a 3 m panel comes down (4 s, normal rail price). It stops with a reason if you run out of money, the grade goes past ±4°, or the way is blocked.
Controls
| Action | Default key |
|---|---|
| Get in / out | E |
| Start / stop boring | Left mouse button |
| Bore grade | R / F |
| Steer | A / D |
| Crawl (outside the tunnel) | W S |
| Dump the bunker behind | Space |
| Spray cooling water | Q |
| Rail mode | H |
| Repair | T |
| Service call (fuel and water) | Y |
| Take apart (build mode, look at it) | X |
Tips
- Pick the launch spot well. The TBM goes where you point it, and it will not come back out.
- Put the dump station on the surface beside the dump yard, so the muck sells as it comes out.
- Keep an eye on the cooling water. Calling service is faster than waiting for the head to cool.
- Add the track-laying rig early if the tunnel will be longer than a few hundred metres.
